Hotel Refurbishment — Basswood Venetian Blinds
A 240-room hotel refurbishment required 3,200 sets of 50 mm basswood venetian blinds in a custom stain, delivered in phases across eleven floors while the hotel remained partially open.
Project at a glance
| Destination | [confirm: country / city] |
|---|---|
| Quantity | 3,200 sets, 50 mm basswood, custom stain |
| Certification | FSC 100%, moisture content 8-10% |
| Delivery | Four shipments over five months, labelled by floor |
| Lead time | 32 days per production batch |
What made it difficult
The hotel stayed open during refurbishment, so blinds could not arrive in one container — they had to match the contractor’s floor-by-floor programme. A mid-project substitution of slat supplier would have created a visible shade difference between floors.
How we delivered
- One specification sheet locked before sampling, so the contractor could not substitute a cheaper slat mid-project.
- Sample room set installed for client sign-off before mass production.
- Staged shipments matched to the fit-out programme, labelled by floor.
- Moisture and coating test reports issued per batch for the consultant’s file.
Planning a similar project? Send the specification and we will return a compliance note and a staged delivery plan.