Project supply is a different business from container wholesale. A hotel order needs a specification that survives a change of contractor, deliveries that match the fit-out programme, and documentation the client’s consultant will accept.

How a project order runs

  1. Specification lock — slat species, width, stain, control type and tolerance confirmed in a single spec sheet.
  2. Sample room set — one room sampled and signed off on site before mass production.
  3. Staged production — produced in phases matching the fit-out schedule, not all at once.
  4. Batch documentation — moisture and coating test reports issued per production batch.
  5. Delivery — labelled by room or floor if required, with a loading plan per shipment.

Case references

Have a tender specification? Send the document and we will return a compliance note showing what we meet, what we do not, and what the alternative would cost.

Send a tender document