Project References
Project supply is a different business from container wholesale. A hotel order needs a specification that survives a change of contractor, deliveries that match the fit-out programme, and documentation the client’s consultant will accept.
How a project order runs
- Specification lock — slat species, width, stain, control type and tolerance confirmed in a single spec sheet.
- Sample room set — one room sampled and signed off on site before mass production.
- Staged production — produced in phases matching the fit-out schedule, not all at once.
- Batch documentation — moisture and coating test reports issued per production batch.
- Delivery — labelled by room or floor if required, with a loading plan per shipment.
Case references
Have a tender specification? Send the document and we will return a compliance note showing what we meet, what we do not, and what the alternative would cost.