Office Fit-Out — Motorised Blinds Across Four Buildings
A corporate campus fit-out needed motorised blinds to one specification across four buildings delivered by different contractors, with remotes commissioned per floor and a single point of accountability.
Project at a glance
| Destination | [confirm: country / city] |
|---|---|
| Quantity | [confirm: sets] motorised 50 mm venetian |
| Control | Motorised, remote pairing per floor |
| Delivery | Per building, four schedules |
| Lead time | [confirm: days] per building |
What made it difficult
Four buildings meant four contractors, four purchase orders and four schedules — but only one acceptable visual result. The specification had to be locked at the factory so that Building C’s slats matched Building A’s, ordered five months earlier.
How we delivered
- One specification sheet locked before sampling, so the contractor could not substitute a cheaper slat mid-project.
- Sample room set installed for client sign-off before mass production.
- Staged shipments matched to the fit-out programme, labelled by floor.
- Moisture and coating test reports issued per batch for the consultant’s file.